Neoen begins constructing 400 MWh battery project in Australia

Neoen, a French renewable energy provider, has issued notice to proceed to a consortium comprising Elecnor and NHOA to commence construction of its Blyth Battery in South Australia. The 200 MW/400 MWh battery will be constructed close to the Blyth West substation and connected to the transmission system of ElectraNet. ElectraNet operates a high-voltage transmission network in South Australia, transporting power from traditional and renewable generators over long distances.

Read More