The largest Middle Eastern country—Saudi Arabia—is ranked as the second major oil producer in the Organization of the Petroleum Exporting Countries (OPEC). The country, which is home to around 34.8 million people, holds 17 per cent of the world’s recognised petroleum reserves and is the largest petroleum exporter. Given the abundant petroleum reserves, Saudi Arabian electricity production for decades has been dominated by oil and natural gas resources.

With the increasing global focus on transitioning to low-carbon economies, the country is now looking to reduce its carbon emissions by decreasing dependence on fossil fuels. The oil-rich country has set a target of generating half of its electricity over the next decade from clean energy sources, which is in line with the Kingdom’s Vision 2030. The latter, introduced in 2016, aims to reduce its dependence on oil, diversify its economy, and develop public service sectors such as health, education, infrastructure, recreation and tourism.

In line with this vision, in 2016 the Ministry of Energy, Industry and Mineral Resources (MEIMR) [which was later split into Ministry of Energy and the Ministry of Industry and Mineral Resources] developed a strategic plan emphasising the need to add more natural gas and renewable energy (RE) resources to the country’s energy mix. Later in 2017, MEIMR formed the Renewable Energy Project Development Office (REPDO) to operationalise and implement the National Renewable Energy Programme (NREP), a strategic initiative under Vision 30. As per the revised targets of NREP, the country plans to install 27.3 GW of RE capacity (mostly solar, followed by wind) by 2023 and 58.7 GW by 2050.

To fully reap the benefits of the upcoming capacity and increase regional power exchange via establishment of cross-border interconnections, the state-owned electric company Saudi Electricity Company (SEC) is dedicatedly working towards establishing a robust grid network across the country. Hence, the ongoing and upcoming investments in the Kingdom’s transmission sector are directed towards expanding, strengthening and modernising grid network.

In addition, to ensure long-term health and sustainability of the Saudi Arabian power sector, the Ministry of Energy has introduced exhaustive reforms aimed at restructuring the state-owned SEC and transforming the sector into a competitive power market.

Industry structure and restructuring of SEC

The Ministry of Energy overlooks the electricity sector in Saudi Arabia. Further, the Energy and Cogeneration Regulatory Authority (ECRA) regulates the power sector. SEC, along with its subsidiaries and affiliates, is the Kingdom’s largest integrated electricity company, and owns and operates around 87 per cent of the total installed generation capacity in the country. It was established in 1998 as a joint stock company, in which the Saudi government and the centrally-owned Saudi Aramco own 81 per cent shares.

Other major power generation companies include Saline Water Conservation Corporation (SWCC), Hajar Electricity Company, Jubail Water and Power Company, Saudi Aramco, and MARAFIQ Power and Water Utility Company.

ECRA, in 2007, prepared the Electricity Industry Restructuring Plan (EIRP) to propose a gradual transformation of the electricity industry from a vertically-integrated utility structure to a more competitive electricity sector in three phases over eight years (though targets were not met). EIRP aimed at unbundling the generation, transmission and distribution segments of SEC, and introducing competition in both supply and retail.

The first phase of the EIRP was implemented in 2012 by launching the National Grid SA, a wholly-owned subsidiary of SEC, to oversee and manage the transmission system, in the country. Further, in March 2020, SEC announced plans to launch a new subsidiary focusing solely on power generation, which will operate as a standalone company. The plan to establish a new company was first announced in November 2018, as part of the second phase of the EIRP.

The third phase entails the deregulation of the electricity market. It proposes to create an independent entity for transmission — an independent system operator (ISO) inside the National Grid SA (ring-fenced), and a principal buyer (PB) entity inside the SEC (ring-fenced).

Further, all of SEC’s electricity generation is planned to be privatised by 2025. The newly privatised power-generation companies are expected to need substantial investment to increase efficiency, meet environmental standards, and replace aging power plants.

The key objective of the restructuring programme is to develop and build a competitive electricity market, which are in line with the Kingdom’s 2030 Vision and the national transformation programme (NTP). NTP aims to develop the necessary infrastructure and create an environment that enables the public, private and non-profit sectors to achieve the vision.

Existing infrastructure

By end-2020, Saudi Arabia had an installed generation capacity of 79.7 GW, of which nearly 87 per cent (69.1 GW) was owned by SEC and the remaining 13 per cent by independent power producers (IPPs). SEC’s capacity includes 15.9 GW of capacity that is jointly owned in partnership with other companies. Majority of the country’s capacity is based on thermal sources comprising natural gas, crude oil, diesel and heavy fuel oil.

Saudi Arabia has started adding RE capacity to its generation mix by setting up solar PV plants over the last couple of years. In November 2019, the ACWA Power-led joint venture (JV) completed Saudi Arabia’s first utility-scale solar farm—the 300 MW Sakaka PV IPP project.

Saudi Arabia has four interconnections with the neighbouring countries of Kuwait, Bahrain, Qatar and UAE through the Gulf Cooperation Council (GCC) interconnection project. As of 2020, Saudi Arabia’s transmission network comprised about 89,100 circuit-km of line length and 1,150 substations at voltage 110 kV to 380 kV. Around half the network comprises of 110 kV−132 kV transmission lines, while SEC also owns 80,900 circuit-km of fibre optic lines and about 702,100 circuit-km of distribution lines.

Electricity sector reforms

In 2020, Saudi Arabia’s Ministry of Energy announced comprehensive reforms in the electricity sector aimed at ensuring a sustainable power industry in the long term in line with the goals of Vision 2030.

The reforms include — transitioning to an optimal energy mix for electricity production, with a shift to RE and efficient natural gas sources; increasing system efficiency and reducing the use of liquid fuels for energy production; increasing the sector’s T&D network security and reliability to enable effective integration of RE; interconnecting the grid with neighbouring countries; and greater environmental compliance to reduce the power sector’s carbon footprint.

To achieve the above-mentioned goals, SEC needs to establish a revenue requirement mechanism, which will ensure that the power utility can cover its costs of providing services, along with achieving a fair return on invested capital. The reforms thus lay critical foundations by helping to create a more solid and financially viable sector to attract the required investments.

National Renewable Energy Programme (NREP)

Saudi Arabia’s NREP, being implemented by REPDO, a governmental agency at the Ministry of Energy set up to support all RE related initiatives in the Kingdom and review all pertinent legal and regulatory frameworks.

Through diversifying Saudi Arabia’s energy mix, the NREP will not only reduce the country’s dependence on oil and its greenhouse gas (GHG) emissions (which is also part of the Paris Agreement); but also create jobs and promote economic development across the Kingdom.

Initially in 2017, the NREP target was to add 9.5 GW of RE capacity by 2023. Of the planned capacity, 5.9 GW was solar-based and 2.4 GW was wind and concentrated solar power (CSP)-based. In 2019, the 2023 target was revised to 27.3 GW (20 GW solar PV and 7 GW CSP, wind), while  the 2030 target was set to 58.7 GW (40 GW PV, 16 GW wind and 2.7 GW CSP). The planned capacity will cumulatively add more than 35 RE parks powered by solar, wind, and CSP across the country.

The NREP will lead to the creation of new RE technologies and support the build-up of the sector through harnessing private sector investment and encouraging public-private partnerships (PPPs).

Figure 1: Revised targets as per Saudi’s NREP
Source: NREP; Global Transmission Research

Power transmission plans

Future transmission investments will be largely directed towards developing grid infrastructure to evacuate power from the upcoming RE plants. Investments will also be envisaged for grid refurbishment and modernisation. To this end, about 5,400 circuit-km of transmission lines and 86 transformer substations will be added by SEC between 2021 and 2023.

Over the last couple of years, SEC has been actively tendering and awarding various transmission expansion projects (majorly local players). Majority of the projects awarded/tendered contracts were either associated with upcoming RE plants or for strengthening the existing transmission infrastructure.

As per Global Transmission estimates, SEC has awarded transmission contracts worth SAR6.8 billion for the construction of new infrastructure and expansion/extension of existing substations over the past 18 months (January 2020-July 2021). These contracts will be executed over the next two to three years and add 2,388 km of transmission line length at 132-380 kV voltage levels.

Further, Saudi Arabia has been focusing on installing hybrid technology for its existing and upcoming substations, making it the first country in the Middle East to adopt the hybrid gas-insulated switchgear (HGIS) technology. Recently, SEC awarded contracts for construction of the 380 kV switching HGIS substations 9098 and 9097, and installation of HGIS at the 380 kV Arar substation.

The table below lists various ongoing transmission projects in the country.

ProjectContractor(s)Cost(SAR million)Duration(months)
Establishment of 20.2-km-long, 132 kV UGC circuits from Substation 8375 to the network and 18-km-long, 132 kV OHTLCapital Lights69.622
Construction of 293.25-km-long, 380 kV OHTLs between Wadi Dawaser and Layla BSPsNational Contracting Company (NCC)30128
EPC for 11.4-km-long, 132 kV OHTL for interconnection of Uraidh (8374) substation to the grid networkTrading Development Partnership (TDP)8225
Construction of 59-km-long, 380 kV double-circuit OHTL between 9017 and 9019 BSPsAl Sharif Group5423
Expansion of 380 kV Nariyah North substationNCC4423
Construction of new indoor 380/132 kV Rafha hybrid GIS substationHyundai Engineering & Construction (Hyundai)26729
380/132 kV Saad solar PV substationAl Sharif Group19826
Construction of 165.66-km-long, 230 kV OHTL connecting HMYM-3 GCP and HMYM-4 GCP substationsJV between Kalpataru Power Transmission Limited (KPTL) and Bin Omairah11729
Installation of 380 kV reactors at Hail 3 substationSiemens Saudi Arabia5720
Construction of 380 kV double-circuit OHTL between Hail and Al Jouf BSPsHyundai41224
Construction of 115/13.8 kV Urairah GIS substation projectPA Cost International5227
Construction of 130-km, 380 kV double-circuit OHTL between Khafji and Nariyah BSPsAl Haider for Trading and Contracting (Al Haider)12727
Construction of 185-km, 380 kV double-circuit OHTL connecting existing 380/110 kV Yanbu City (YCNT) and 380/132 kV Umlujj North (UMN) BSPsJV comprising of KPTL and Bin Omairah234NA
Construction two 30 kV OHTL – one double-circuit OHTL will connect Rafha and Qaisumah BSPs (326.93-km), and the second OHTL will connect Arar and Rafha BSPs (334.70-km)Larsen & Toubro Limited (L&T)67124
Installation of DRPC (STATCOM technology) at existing 380 kV Najran substationAlfanar Construction Company139NA
Installation of DRPC (STATCOM technology) at 380 kV Kudimi substationSiemens115NA
Construction of 400-km, 380 kV double-circuit OHTL between Qassim 2 and Madina East BSPsL&TNANA
Construction of 55-km-long, 115 kV double-circuit OHTL connecting 115/13.8 kV Rafeah-2 and Qaryat Al Ulya substationsAl Haider4923
Construction of 27.9-km-long, 132 kV double-circuit OHTL connecting Al Aridah, Ayban and Ad Dayir substationsAl Sharif Group39.224
Construction of 44.55-km, 380 kV OHTL for connecting 380/132/13.8 kV Al Aseelh (ASL) BSP to the grid networkNational Power Construction Corporation (NPCC)6125
Installation of 380 kV reactors at 380/115 kV Qaisumah substationAlfanar Construction Company4118
Table 1: Key ongoing transmission projects in Saudi Arabia
Note: UGC- underground cable; OHL- overhead line; OHTL- overhead transmission line; GIS- gas-insulated switchgear; BSP- bulk supply point; JV- joint venture; NA- not available; STATCOM- static synchronous condenser; DRPC- dynamic reactive power compensator
Source: News reports; Global Transmission Research

SEC is also undertaking initiatives and programmes to establish a secure and reliable, smart and automated grid network in the country, for which it plans to accelerate its investments. During 2020, SEC undertook a significant smart meter rollout across the country – around 8.8 million smart meters were installed, with 100 per cent penetration planned by the end of 2021. Further, efforts are being taken for creating an information infrastructure, using business intelligence and integrating smart grid components.

To finance its general corporate operations and various capital projects (such as smart meters, grid reliability improvement and new interconnection projects), SEC signed a seven-year unsecured syndicated borrowing agreement in 2020, worth SAR9 billion, with seven major Saudi banks, namely National Commercial Bank, Bank Albilad, Al-Rajhi Bank, Riyad Bank, Samba Financial Group, Banque Saudi Fransi and the Saudi British Bank.

Grid interconnection plans

The country also plans to implement grid links to strengthen regional cross-border interconnections as well as construct new high-capacity lines connecting to neighbouring Gulf countries. The key planned interconnection projects are as follows:

Egypt–Saudi Arabia grid interconnection projectinvolves the construction of a 1,300-km-long, 500 kV, multi-terminal high voltage direct current (HVDC) line from Badr in Egypt to El-Madinah El Munawara via Tabuk in Saudi Arabia, along with associated converter stations and switching stations in both countries. Of the total overhead line length, 820 km will be laid in Saudi Arabia and the remaining 480 km in Egypt. A 20-km submarine cable crossing the Gulf of Aqaba will also be laid to link the two countries. The project is expected to be fully commissioned by 2025.

Jordan–Saudi Arabia interconnection project proposes to connect the power grids of Jordan and Saudi Arabia via a 164-km-long line from Qurayyat (Saudi Arabia) to East Amman (Jordan). The Jordan–Saudi Arabia interconnection aims to increase network reliability for both countries and increase the use of RE resources. In August 2020, Jordan’s Ministry of Energy and Mineral Resources and Saudi Arabia’s Ministry of Energy signed a memorandum of understanding (MoU) on the framework for connecting the power grids of both the countries. The project is expected to be fully commissioned by 2022.

Saudi Arabia is also exploring options for establishing a grid link with Iraq, to improve the electricity situation in the latter.

Additionally, Saudi is also part of the Arab Common Market of Electricity, which will be an integrated electricity supply system for the power grids of the Arab countries. In mid-2020 the Arab Ministerial Council of Electricity approved two key agreements under the programme—the General Agreement and the Arab Common Market Agreement—for the functioning of the joint market. The MoU regarding the same was signed by Egypt, Kuwait, Saudi Arabia, the UAE, Bahrain, Algeria, Sudan, Iraq, Oman, Qatar, Comoros, Libya, Morocco and Yemen during the 12th session of the Arab Ministerial Council of Electricity in April 2017.

Conclusion

Saudi Arabia, under its Vision 2030, is implementing one of the largest RE expansion plans in the region. Further, the transition towards clean energy will help greatly in decreasing its carbon footprint and positioning itself as an RE leader in the region. In line with the ambitious targets, SEC is taking the necessary initiatives to create a robust and smart grid to fully evacuate power from the planned RE generation. Further, developing grid interconnections with Middle Eastern and African countries will not only facilitate power trade, but also boost economic growth and development in the country and the region.

The article has been sourced from Global Transmission and can be accessed by clicking here